陕西思泉机械设备有限公司
sales@siquanmachinery.com
  • Home
  • About Us
  • News
  • Product
  • Contact
  • Drilling Tools
  • Drilling Rig Components
  • Wellhead Control Equipments
  • Oil Production Equipments
  • Drilling & Fishing Jar
  • Wellhead Handling Tools
  • Fishing Tool
  • OCTG
  • Cementing Tools
  • Solid Control System
  • Tel.: 0086-29-8557 3848
  • Email: sales@siquanmachinery.com
Substructure
Source:SIQUAN|[ 2014-03-05 ] Hits:1140
摘要:
Design features of substructure
The types of substructure are divided into four kinds as slingshot (dually raised- type), swing up, block package and box-on-box.
Structural features of slingshot substructure
●The drill floor and the equipments on it can be installed at low position; and the mast is erected up to vertical position while the drill floor keeps low-position, then the drill floor and the mast are lifted integrally to working position. 
●There are two hydraulic cylinders equipped on top layer of the substructure; they can be used for buffering and regulating while lifting the drill floor, and as a pushing force while laying down the drill floor. 
●It is designed into modules. For land way and railway transportation, the substructure can be disassembled into small pieces and also into large pieces for oil field transportation as well. 
●There is standby interface at the bottom layer of the substructure for integral trailer or horizontally moving device; the mast, drawworks and BOP device etc can be moved integrally. It meets the requirement of quick movement and drilling cluster well. 
The structural features of swing up substructure 
●Parallelogram lifting structure is used, so drill floor and the equipments on it can be installed at low position, and lifted by the drawworks force. 
●There are two hydraulic cylinders equipped on top layer of the substructure; they can be used for buffering and regulating while lifting the drill floor, and as a pushing force while laying down the drill floor. 
●Less power is needed and stable for lifting. 
The features of block package substructure
●The structural type is “tall front and low back” . The front of the substructure is taller, meeting the requirement of standard BOP installation. The back of the substructure is lower, meeting the installation requirement of heavier power equipment and drive device. 
●The main parts are big components with good rigidness, so they are stable. 
The features of box-on-box substructure
●The main structure is big box-on-box structure, the location between each layers is fixed by combination of concave and convex blocks. 
●It is simple, quick and stable for its installation.
Technical parameters1:
Type  Swing up type  Box-on-box
Type
Slingshot type  Block package Type
Model  DZ158/6-S DZ180/6-S DZ170/8.6-XD DZ225/7.5-G DZ315/9-G DZ225/7.5-K
Drill floor height
(M)
6 6 8.6 7.5 9 7.5
Clear height
under RT
beam(M) 
4.3 4.3 7.223 6.26 7.62 6.32
RT beam
load(kN )
1580 1800 1700 2250 3150 2250
Setback load
(kN )
870 1080 1080 1125 1800 1440
Mast bottom
span (M) 
/    /  7.5 8 8 8
Technical parameters2:
Type  Block package  Slingshot  Integral swing up  Swing up 
Model  DZ315/7.5-K  DZ315/9-K  DZ450/9-K  DZ450/9-G  DZ450/10.5-S  DZ675/12-S 
Height of drill floor(M) 7.5 9 9 9 10.5 12
Clear height under RT beam (M) 6.26 7.62 7.727 7.6 9.227 10
RT beam load (kN ) 3150 3150 4500 4500 4500 6750
Setback load (kN ) 1800 1800 2520 2520 2520 3250
Mast bottom span (M) 9.11 9.11 9.11 9 8.5 10

 

Home   |  About Us   |  News   |  Product   |  Contact  

Copyright© 2014 SiQuan. All Right Reserved. Designed by: Fangao
Tel: 0086-29-8557 3848 Fax: 0086-29-8557 3848 Website: www.siquanmachinery.com
Add.: Room 10901, D9th Building, Zijunchang’an Community, Zhuque street,Yanta District,Xi’an,China Code: 710061